Dengtai factory with fixed ladder on modern facade

Steel Ladder Factory · Jingxing, Shijiazhuang

Factory Tour - Dengtai
Steel Ladder Factory

3000 m² plant, two production lines, 1500 t of fixed ladders a year. CNC plasma cutting, 160 T press brake, 8+ weld stations — walk the floor before you order.

OSHA 1910.27 BS 4211 EN ISO 14122-4 AS 1657 Full DoC & MTC

On the Floor

Factory Overview: 3000㎡ in Shijiazhuang

No renders, no stock photography — these are real photos from the Jingxing plant, 280 km from Tianjin port.

Location: No.1 Yixin Road, Jingxing Mining District, Shijiazhuang, Hebei — 300 km from Beijing, 280 km from Tianjin port. Audits welcome in person or by video.

Output & Lead Times

Production Capacity: 1500 t/Year

Two production lines feed 8–12 × 40ft containers every month. Standard production 15–25 business days after drawing approval, with an expedited 10–15 day lane at +20–30%.

1,500t
Annual Output
14
Weld Stations
25
Team Members
Get a Production Slot
  • 8–12 × 40ft containers shipped per month
  • VCI rust protection + ISPM 15 heat-treated wooden crates
  • EXW / FOB / CIF terms available
  • 15–25 business days production lead time
  • HDG 2–3 days included inside the lead time
  • Free drawing review on every inquiry

Inside the Plant

Key Equipment & Processes

The equipment list behind 500+ fixed ladder projects — fabrication, bending, welding, lifting and surface prep all in-house.

CNC Plasma / Oxy-Fuel Cutting

Profile cutting of stringers, brackets and cage hoops with dimension checks to ISO 2768-mK on first pieces.

160 T Hydraulic Press Brake

Bending of walk-thru rails, platform edges and bracket profiles to drawing tolerances.

8+ MIG/MAG Weld Stations

Certified welders to ISO 9606-1, WPQR per ISO 15614-1. Visual inspection per ISO 5817 Level C, PT on ≥10% of welds.

5 T Overhead Crane

Handles 12 m+ single-piece ladder sections and full cage assemblies during pre-assembly QC.

Shot-Blast Room

Surface prep to SA 2.5 before painting — zinc-rich primer 80 μm + polyurethane topcoat 50 μm, adhesion to ISO 2409.

Calibrated Inspection Tools

Micrometers, callipers, coating thickness gauges and weld gauges — all QC records kept 10 years.

Hot-Dip Galvanizing

HDG Partner: 14m Bath Within 30km

We do not run our own galvanizing line — we run a long-term contract with a certified HDG partner 30 km from the plant. Their bath holds a 14 m single piece, which covers our tallest standard and custom sections.

ISO 1461:2022 coating: local ≥85 μm, average ≥100 μm, with adhesion and uniformity verified and reported on every order.

Galvanizing Facts

  • 30 km radius

    Short transport = same-week turnaround, less handling damage.

  • 14 m bath

    Single-piece HDG for long ladder sections — no mid-section splices.

  • 2–3 days in schedule

    HDG is inside the 15–25 day production lead time, not added on top.

  • Coating report

    Thickness readings shipped in the free documentation package.

Verify Us In Person

Schedule a Factory Audit

We accept audits in person or by live video walk-through. Send your dates and audit checklist — we will confirm within 24 hours.

What You Can Inspect

Welding & fabrication

ISO 5817 Level C visual inspection, PT on ≥10% of welds, welder certs to ISO 9606-1.

QC records

MTC, dimension reports, weld records, HDG coating reports and photos — kept 10 years.

Packaging line

VCI film, vacuum wrap and ISPM 15 heat-treated crates on real shipments.

HDG partner plant

Optional 30 km trip to the galvanizing line, arranged on request.

+86 155 1187 9488
No.1 Yixin Rd, Jingxing, Shijiazhuang, Hebei

Request an Audit Visit

+ More specifications (height, quantity, cage, standard)
Thank you. Our team will respond within 24 hours.
Something went wrong. Please email sales@dtsteelladder.com directly.
Quick Answers

Common questions

Where is your factory?

No.1 Yixin Road, Jingxing Mining District, Shijiazhuang, Hebei, China — about 300 km from Beijing and 280 km from Tianjin Port. The plant covers 3,000 m² with two production lines and 25 staff, including 14 fabricator-welders.

Can I schedule a factory visit or audit?

Yes — we welcome audits on any working day; message WhatsApp +86 155 1187 9488 to arrange a date. Our hot-dip galvanizing partner is within 30 km with a 14 m bath, so you can see the whole process chain.

How do you control quality?

Five-stage inspection: incoming steel checked against the MTC, CNC cutting with first-piece full dimension check, welding to ISO 5817 Level C with ≥10% random dye-penetrant testing, HDG per ISO 1461 (local ≥85 μm, average ≥100 μm), and final cage/rail pre-assembly. Welders hold ISO 9606-1 certificates with WPQR per ISO 15614-1.

Do you keep QC records and provide documents?

Yes — QC records (MTC, dimension reports, weld records, coating reports, photos) are kept 10+ years and available on request. Every shipment includes a free documentation pack: MTC (EN 10204 3.1), weld inspection records, dimension verification, HDG coating report, DoC and structural calculations.

What is your production capacity?

Around 1,500 tonnes per year — roughly 6,000-10,000 linear metres depending on configuration — and 8-12 × 40 ft containers exported monthly. Standard lead time is 15-25 working days after drawing approval; express runs 10-15 days at a 20-30% surcharge.

Project References · 500+ Projects · 50+ Countries

Proven in real facilities

Reference projects are shown by industry, country and scale. Client names are available on request with approval.

National utility projects — 15+ countries

23 documented projects, 2021-2025 · 2025

All standards

Energy & industrial clients — Global

500+ projects since 2004 · 2004-2025

Full compliance docs

Largest single order — Malaysia

60 units in one project · 2021

HDG