Transparent 7-Step Workflow

Process - From Inquiry to Delivery

From inquiry to shipping: engineering review ≤4h, shop drawings 1–2 days, production 15–25 working days — every step documented, every gate checked.

≤4h

Engineering Review

1-2d

Shop Drawings

15-25d

Production

24h

Quote Response

Dengtai fixed ladder with platform on building exterior — factory installation
OSHA 1910.27 BS 4211 EN ISO 14122-4 AS 1657 Full DoC & MTC

From Inquiry to Delivery

The 7-Step Fixed Ladder Order Process

Every Dengtai order follows the same documented path — with a hard time commitment and a QC gate at each step. No surprises, no silent delays.

Steps 1–2

Step 1-2: Inquiry & Engineering Review (≤4h)

  • 1
    Inquiry — send specs, drawings or a rough idea. Height, material, quantity and the standard you must meet.
  • 2
    Engineering Review ≤4h — our engineers check feasibility, rung loads and clearances within 4 business hours.
Gate: feasibility confirmed + itemized quote returned within 24h.

Steps 3–4

Step 3-4: Shop Drawings & Approval (1-2 Days)

  • 3
    Shop Drawing — full fabrication drawing with dimensions, weld callouts and anchor plan in 1–2 days.
  • 4
    Your Approval — you sign off the shop drawing before any steel is cut. Nothing runs without it.
Gate: drawing approval is the release point for production.

Step 5

Step 5: Production (15-25 Working Days)

Material cutting, welding to ISO 5817, rungs pitched at 280 mm, and surface treatment. Your ladder is made to order — not pulled from stock — so every rung and bracket matches the approved drawing.

  • Q235B / SS304 / SS316 fabricated to spec
  • HDG 85–100 μm or electropolish finish
  • Cage hoops Φ700 mm and rest platforms as specified
Gate: in-process inspection at weld, rung-pitch and coating checkpoints.

Steps 6–7

Step 6-7: Pre-Assembly & Shipping

  • 6
    Pre-Assembly & QC — trial-fit in the factory so the install drawing matches what arrives on site. Zero rework.
  • 7
    Shipping — VCI rust protection, ISPM 15 heat-treated crates, EXW / FOB / CIF terms.
Gate: final dimensional check + DoC, MTC 3.1 and structural calcs packed with the order.

Documentation Gate

The Shop Drawing Is Your Control Point

Before any steel is cut, you approve the shop drawing. That single signature locks the dimensions, material grade, weld spec and anchor plan — so there is nothing left to negotiate when the crate lands.

  • Full fabrication drawing with weld callouts
  • Anchor plan — M12 bolts, C25 concrete wall spec
  • Approval confirms price, lead time and compliance docs
  • Free revision rounds before sign-off

What you approve before production

Dimensions

Height, rung pitch 280 mm, clear width 500 mm, cage Φ700 mm.

Material & finish

Q235B, SS304, SS316; HDG 85–100 μm or electropolish.

Fall protection

Cage start 7–8 ft, PFAS-ready rail for ladders over 24 ft.

Document pack

DoC, MTC 3.1, structural calcs, WPS confirmed in the approval.

Request Your Shop Drawing
Dengtai fixed ladder QC inspection before shipping

QC at Every Step

Checked Before It Ships — and Before It Leaves the Shop

Weld inspection to ISO 5817

Every weld checked for profile and penetration before surface treatment.

Rung pitch and plumb check

280 mm pitch and 1.5 kN per-rung load confirmed against the drawing.

Trial-fit pre-assembly

Full mock-up so the install drawing matches what arrives on site.

Documents sealed at final QC

DoC, MTC 3.1 and structural calcs released only after final sign-off.

≤4h
Engineering Review
1–2d
Shop Drawings
15–25d
Production

Ready When You Are

Start Your Project

Send your drawings today — get engineering feedback within 4 hours and an itemized quote in 24. The 7-step clock starts the moment you hit send.

Start Your Project
Quick Answers

Common questions

How long does a full order take from inquiry to delivery?

Engineering review ≤4h, shop drawings 1-2 days, production 15-25 working days, then pre-assembly and shipping.

When do I approve the shop drawing?

Step 4 - you sign off the shop drawing before any steel is cut; nothing runs without your approval.

What do I need to send to start an order?

Height, material, quantity and the standard you must meet - plus a drawing or rough idea; our engineers do the rest.

Do you pre-assemble ladders before shipping?

Yes - every ladder is dry-fitted and dimension-audited at the factory before packing.

What QC checks happen during production?

Welds inspected to ISO 5817, 280 mm rung pitch and 1.5 kN per-rung load confirmed against the approved drawing.

Project References · 500+ Projects · 50+ Countries

Proven in real facilities

Reference projects are shown by industry, country and scale. Client names are available on request with approval.

National utility projects — 15+ countries

23 documented projects, 2021-2025 · 2025

All standards

Energy & industrial clients — Global

500+ projects since 2004 · 2004-2025

Full compliance docs

Largest single order — Malaysia

60 units in one project · 2021

HDG

Get Your Quote

Talk to an Engineer

Free drawing review. Itemized quote in 24 hours. No obligation.

Why Work With Dengtai?

Full Compliance Docs

DoC, MTC, structural calcs included free.

24-Hour Quote

Engineering review + itemized quote within one day.

Global Delivery

8–12 containers/month. VCI + ISPM 15 packaging.

+86 155 1187 9488
Jingxing, Shijiazhuang, Hebei, China

Request a Quote

+ More specifications (height, quantity, cage, standard)
Thank you. Our team will respond within 24 hours.
Something went wrong. Please email sales@dtsteelladder.com directly.

We use cookies to analyze site traffic. Learn more about cookies

Request Quote WhatsApp